Base Rate

 S.N.
Particulars
For the Month of Shrawan 2075
 a
Cost of Fund
7.17%
 b
Cost of CRR
0.31 %
 c
Cost of SLR
0.14 %
 d
Operating Cost
2.31%
 e
Return on Assets
0.75 %
Base Rate (Total of a to e)
10.68 %

NEWS/PRESS RELEASE

Top